Author Topic: July 2020 modifications  (Read 323 times)

Deuce

  • Administrator
  • Grade VII contributor
  • *****
  • Posts: 124
July 2020 modifications
« on: July 28, 2020, 04:02:46 PM »
Working on finless divider system, playing around with center bed tensioning systems.  Full strength connected to frame airside clip in for those concerned about winds turning the ledge (you can tension from below).

Deuce

  • Administrator
  • Grade VII contributor
  • *****
  • Posts: 124
Re: July 2020 modifications
« Reply #1 on: August 15, 2020, 09:48:12 PM »
Now middle of August, but getting a bit of time for:
Better top o’ zipper vent.
Concertina top cone/fly stuff sack (fly also has interior cord to tie up fly ready to deploy when not needed.)

pics and sketches here: